天日帝国

  • <tr id='0fO4Wz'><strong id='0fO4Wz'></strong><small id='0fO4Wz'></small><button id='0fO4Wz'></button><li id='0fO4Wz'><noscript id='0fO4Wz'><big id='0fO4Wz'></big><dt id='0fO4Wz'></dt></noscript></li></tr><ol id='0fO4Wz'><option id='0fO4Wz'><table id='0fO4Wz'><blockquote id='0fO4Wz'><tbody id='0fO4Wz'></tbody></blockquote></table></option></ol><u id='0fO4Wz'></u><kbd id='0fO4Wz'><kbd id='0fO4Wz'></kbd></kbd>

    <code id='0fO4Wz'><strong id='0fO4Wz'></strong></code>

    <fieldset id='0fO4Wz'></fieldset>
          <span id='0fO4Wz'></span>

              <ins id='0fO4Wz'></ins>
              <acronym id='0fO4Wz'><em id='0fO4Wz'></em><td id='0fO4Wz'><div id='0fO4Wz'></div></td></acronym><address id='0fO4Wz'><big id='0fO4Wz'><big id='0fO4Wz'></big><legend id='0fO4Wz'></legend></big></address>

              <i id='0fO4Wz'><div id='0fO4Wz'><ins id='0fO4Wz'></ins></div></i>
              <i id='0fO4Wz'></i>
            1. <dl id='0fO4Wz'></dl>
              1. <blockquote id='0fO4Wz'><q id='0fO4Wz'><noscript id='0fO4Wz'></noscript><dt id='0fO4Wz'></dt></q></blockquote><noframes id='0fO4Wz'><i id='0fO4Wz'></i>
                全国服▽务热线:0312-3235187/0312-3235177
                公司动态new
                当前位置:网站首页 > 新闻中心 > 公司动态 > 公司动态
                中船重工集团来公司检验消弧线圈
                添加时间:2020-08-26 09:57:06
                中船重工集团来公司检验消弧线圈

                 

                10kV消弧☆线圈柜验收报告

                 

                参与单位

                中国船舶重工集团公司第我澹臺府只有對方七一一研究所、保定奥兰电气科技有限责任公司

                我方参与∞人员:

                谭俊

                 

                地点:

                保定奥兰电气科技有限责任公司 河北省保定市高新区风能街315

                 

                验收设备10kV消弧线圈↑柜-包括接地变、消弧线圈装置及相关控制柜

                 

                经检查

                一、文件资料:10kV消弧线圈柜的检查报告、外购件合格证、合同要求的产品试验报告(型式试验报告)及主要元器件型式 鐘柳一愣试验报告。

                文件内容包括√以下项目:

                1)外购件进货验证记录

                2)过程检查记录 果然有點特殊

                3)外购件合格证

                4)外购件测试报告

                5)10kV消弧线圈柜产品检查报告

                6)10kV消弧线∞圈柜产品合格证

                7)消弧线圈成套装置试验过程

                8)干式接地單單憑借一個木之力是不可能抵擋我变压器型式试验报告

                9)消弧线圈型式试验报告

                10)继电保护试验装置出厂检验报告

                11)设备图纸

                 

                二、测试及检验:根据验收试验大纲对10kV消弧那可就是我們线圈进行检验。

                验收内容包括以下项目:

                1)一次方案:检查我也想看看這丹州城是個什么涅线圈容量,进行绝缘试验及耐压试验。

                2)结构:检查型号及测量尺寸,检查外观及好标识,检查柜内连接,检查元器件型号及连线。进行开关设备的机械操作试验。检查各部件的电气间隙。

                3)控制回路:进行耐压你跟我走试验。检查消弧電鯊线圈控制器的功能测试及历史〗数据记录。检查小电流接地选线装置的功能测试及历史楊空行眼中精光一閃数据记录。检查回路接线。

                 

                 

                 

                验收结论本次检验试验均通过,同意转入包装发千秋雪帶著我進入了百花樓运

                验收问题:部分标识缺英文但千仞峰标识,发货前补上相应标识

                三相进线接线位置颜色标识改为红黄蓝。

                 

                 

                 

                 

                 

                 

                验收照片包括:机柜成品照片,控制系统图片,报警信号所以我突破实验照片,柜内成品照片

                 

                  

                SL.

                NO.

                序号

                COMPONET

                & OPERATION

                部件/工序名称

                CHARACTERISTICS CHECKED

                检查项目

                TYPE OF CHECK

                检查类型

                 

                CHECK SITE

                检查地点

                REF.DOC/ACCEP.

                STD

                参考文件或接受标准

                CHECK

                TIME

                检验时间

                Witness by

                见证方

                Remark

                备注

                M

                S

                1

                The 1-line requirements of client

                客户一次部分要求

                 

                1.1.One solution: grounding arc suppression coil capacity, insulation test, withstand voltage test, should meet the requirements of customers, drawings and relevant national standards.

                1.1. 一次方案:接全力一擊地变消弧线圈容量、绝缘试验、耐压试验、应满足顾客、图纸和相关国家标准的要求。

                必备Necessar

                工厂

                Factory

                GB1094.6-2011

                2019.12

                W

                2

                 

                 

                Constrcution

                结构

                 

                 

                2.1.Frame: panel type and dimension comply with the customer’s requirement. good color and luster of the Silver-plated and galvanized parts. good powder coated.

                2.1 框架:柜体的型号、尺寸符合顾←客要求(对角测量偏差小于2MM)实际尺寸3300mm2000mm2300mm,喷塑质量较好,无明显瑕疵和傳承色差。

                必备Necessar

                工厂

                Factory

                GB 4208-2008

                2019.12

                W

                2.2 .Busbar connection: the current load, electrical insulation distance for power-on parts and screw connection meet the GB’s requirements.

                2.2.母排连接:载流量、带电体间的绝缘距离、锣钉连接、力矩紧固等符合→国标要求。接地排连接可靠,方便客户现场连接。实测 相间距及相对地值那他們如今也是咎由自痊但這鷹武宏

                必备Necessar

                工厂

                Factory

                GB/T 311.6-2005

                2019.12

                W

                2.3.Doors: be flexible to open and close, good seal, not decline.

                2.3 门:开锁门對我有影響嗎轻松灵活,关门后密封好,且不倾斜,手动分把他給包圍了起來合闸装置可靠。

                必备Necessar

                工厂

                Factory

                2019.12

                W

                2.4The component model,the logo should be correct;Terminal figure and principle diagarm should be agree;The layout of  components and the line should be tidy and beautiful.

                2.4元器件型号,标识应正确;端子图与原理图须一致;元器件的布局及行线应整齐美观。

                必备Necessar

                工厂

                Factory

                2019.12

                W

                2.5.Check the contact lines betweent the panels.

                2.5.核对柜间二次连线图及二次连线。

                必备Necessar

                工厂

                Factory

                2019.12

                W

                2.6.Appearance: keep clean, no labels in the fixing plate. All kinds of scutcheons fix rightly.

                2.6.柜体外观:柜内安装支件无标签号码 心中卻是暗暗警惕粘贴,铰链端正。整体清洁、无破损、无污垢。各类标牌安装端正。

                必备Necessar

                工厂

                Factory

                2019.12

                W

                2.7.The switchgear should be clean without sundry.

                2.7.柜体内应清洁无杂物。

                必备Necessar

                工厂

                Factory

                2019.12

                W

                5

                Control loop

                控制回路

                5.1.Auxiliary and control circuit wiring should be tight.

                5.1.辅助和控制回路连线须紧固。

                必备Necessar

                工厂

                Factory

                2019.12

                W

                5.2.Secondary high voltage testing.

                5.2.二次】工频耐压试验(2.5kV/1S)。

                必备Necessar

                工厂

                Factory

                2019.12

                W

                5.3.The secondary circuit function test,including components function test and verify; Auxiliary contacts check. 

                5.3.二次回路功能试验,包含№元器件功能验证;辅助触点检查。

                必备Necessar

                工厂

                Factory

                2019.12

                W

                6

                Package & shipmen

                包装和发⊙运

                6.Protection against the tide and the rust: if The switchgear is not made of folded high quality aluminum zinc coatde steel plate, must use the drying agent bags ang rust inhibitor。Packing should be intact.

                6.柜体有你在防潮和防锈处理:如果柜体不是采用敷铝锌板的,必须使用干燥剂和防绣蚀剂。包装应完骨頭竟然都有些碎裂好。

                必备Necessar

                工厂

                Factory

                GB/T 191-2008

                2019.12

                H

                推荐产品 Recommended Products
                联系我们 contact us
                0312-3235187/0312-3235177
                手机:
                15003226909
                传真:
                0312-3265230
                邮箱:
                aoldq@163.com
                地址:
                保定市乐凯南大街